Bathroom Remodeling in Davie, FL
Dated, cramped, or leaking bathroom in Davie? We remodel the whole thing — plumbing and build under one licensed family, so there’s no coordinating separate trades. Since 1997, and if we can’t fix it, it’s free.
Bathroom Remodeling in Davie, done right the first time
A dated bathroom is one of the best returns in the house — and one of the trickiest, because it’s plumbing and building both. Ming’s Contracting Dynasty handles the whole remodel with one licensed family: we design the space, move the plumbing, waterproof and tile, and finish it — no coordinating a plumber against a contractor against a tile setter. Holding both a plumbing (CFC1431707) and building (CBC1267113) license means the pipes behind the wall and the finish in front of it are one crew’s responsibility. Family-owned and doing it right since 1997.
Davie’s ranch and acreage homes have big baths stuck in another decade; we reconfigure and rebuild them, plumbing to finish, in one crew.
Design to finished bath
We handle the whole remodel in Davie — layout, plumbing, tile, and finish.
Plumbing done in-house
Licensed for plumbing AND building, so the pipes and the build are one accountable crew.
Walk-in showers & soaking tubs
Modern showers, freestanding tubs, and safer, accessible layouts.
One licensed family
No subcontractor roulette — the family on the job since 1997.
Keep it all under one licensed family
More help in Davie
Leak Detection in Davie, FLDrain Cleaning in Davie, FLEmergency Plumber in Davie, FLWater Heater Repair in Davie, FLSlab Leak Repair in Davie, FLSewer Line Repair in Davie, FLRepiping in Davie, FLHydro Jetting in Davie, FLWater Filtration in Davie, FLKitchen Remodeling in Davie, FLAll plumbing in Davie → (city page)
“If we can’t fix it, it’s free.”
The promise a grandfather made — and a family keeps
Bathroom Remodeling in Davie — common questions
Do you handle the plumbing and the remodel, or do I need two contractors?
One crew. We hold both plumbing (CFC1431707) and building (CBC1267113) licenses, so we move fixtures, re-pipe, and build the whole bath — no coordinating separate trades.
How long does a bathroom remodel take in Davie?
Most baths run a couple of weeks depending on scope and finishes. We give you a realistic timeline up front and keep the project moving.
Can you reconfigure the layout, not just refinish?
Yes — move the shower, add a double vanity, relocate the toilet. Because we own the plumbing and the build, layout changes are straightforward.

