Bathroom Remodeling in Cutler Bay, FL
Dated, cramped, or leaking bathroom in Cutler Bay? We remodel the whole thing — plumbing and build under one licensed family, so there’s no coordinating separate trades. Since 1997, and if we can’t fix it, it’s free.
Bathroom Remodeling in Cutler Bay, done right the first time
A dated bathroom is one of the best returns in the house — and one of the trickiest, because it’s plumbing and building both. Ming’s Contracting Dynasty handles the whole remodel with one licensed family: we design the space, move the plumbing, waterproof and tile, and finish it — no coordinating a plumber against a contractor against a tile setter. Holding both a plumbing (CFC1431707) and building (CBC1267113) license means the pipes behind the wall and the finish in front of it are one crew’s responsibility. Family-owned and doing it right since 1997.
Cutler Bay’s homes — older and post-Andrew — have baths ready for updating; we gut, re-plumb, and rebuild them, one licensed crew.
Design to finished bath
We handle the whole remodel in Cutler Bay — layout, plumbing, tile, and finish.
Plumbing done in-house
Licensed for plumbing AND building, so the pipes and the build are one accountable crew.
Walk-in showers & soaking tubs
Modern showers, freestanding tubs, and safer, accessible layouts.
One licensed family
No subcontractor roulette — the family on the job since 1997.
Keep it all under one licensed family
More help in Cutler Bay
Leak Detection in Cutler Bay, FLDrain Cleaning in Cutler Bay, FLEmergency Plumber in Cutler Bay, FLWater Heater Repair in Cutler Bay, FLSlab Leak Repair in Cutler Bay, FLSewer Line Repair in Cutler Bay, FLRepiping in Cutler Bay, FLHydro Jetting in Cutler Bay, FLWater Filtration in Cutler Bay, FLKitchen Remodeling in Cutler Bay, FLAll plumbing in Cutler Bay → (city page)
“If we can’t fix it, it’s free.”
The promise a grandfather made — and a family keeps
Bathroom Remodeling in Cutler Bay — common questions
Do you handle the plumbing and the remodel, or do I need two contractors?
One crew. We hold both plumbing (CFC1431707) and building (CBC1267113) licenses, so we move fixtures, re-pipe, and build the whole bath — no coordinating separate trades.
How long does a bathroom remodel take in Cutler Bay?
Most baths run a couple of weeks depending on scope and finishes. We give you a realistic timeline up front and keep the project moving.
Can you reconfigure the layout, not just refinish?
Yes — move the shower, add a double vanity, relocate the toilet. Because we own the plumbing and the build, layout changes are straightforward.

